Durham Region & Durham Region Transit Logos
Highway 2 Transit Priority Measures Class & Design
Study Area Graphic
Date:

  Home  | FAQs |   EA Addendum  | Public Consultation | ESRPreferred Design (Plans/Drawings)  | Contact Us

Quick Links:

  Durham.ca | DurhamRegionTransit.com | Long Term Transit Strategy


Addendum to the Highway 2 Transit Priority Measures Class EA Study (ESR)


 
December 18, 2014: An Addendum to the Highway 2 Transit Priority Measures Class EA study (Addendum) has been completed and is filed for public review and comment until February 9, 2015.

Notice of Filing of Addendum (1.3 MbB)
(Includes instructions for commenting)

 

Environmental Study Report Addendum (Addendum):

1) Main Report (23 MB)
2) Appendix A - Consultation  
  A1 Notices
A2 Agency
A3 Public
A4 PIC Display Material
A4 PIC Comment Forms
(1 MB)
(301 KB)
(730 KB)
(21 MB)
(2 KB)
3) Appendix B Natural Environment Report (14 MB)
4) Appendix C Stage 1 and 2 Archaeological Assessments (10 MB)
5) Appendix D Cultural Heritage Evaluation Report and Heritage Impact Assessment (48 MB)
6) Appendix E Drainage and SWM Report (8 MB)
7) Appendix F Traffic Analyses (4 MB)
8) Appendix G Noise Assessment (10 MB)

 

Connecting CommunitiesMetrolinx & Ontario Logos

convenient . sustainable . reliable