Durham Region & Durham Region Transit Logos
Highway 2 Transit Priority Measures Class & Design
Study Area Graphic
Date:

  Home  | FAQs | Public Consultation | ESRPreferred Design (Plans/Drawings)  | Contact Us

Quick Links:

  Durham.ca | DurhamRegionTransit.com | Long Term Transit Strategy


The Highway 2 Transit Priority Measures Class EA Study (ESR)


 
March 30, 2012: The Highway 2 Transit Priority Measures Class EA study (ESR) has been completed and is filed for public review and comment until May 7, 2012.

Notice of Study Completion (992 KB)
(Includes instructions for commenting)

 

Environmental Study Report (ESR):

1) Executive Summary (118 KB)
2) Hwy 2 Transit Priority Measures ESR-Section I-Main Report (1.6 MB)
3) Hwy 2 Transit Priority Measures ESR-Section II-Preferred Design Sheets (6.2 MB)
4) Hwy 2 Transit Priority Measures ESR-Section II-Altervatives 1-3 Sheets (5.2 MB)
5) Hwy 2 Transit Priority Measures ESR-Section II-Alternative 4 Sheets (5.6 MB)

6) Appendix A - Consultation (26 MB)

7) Appendix B - Natural Environment Report (2.3 MB)

8) Appendix C - Archaeological Assessment Stages 1-3 and GPR Investigation Post Cemetery (20 MB)

9) Appendix D - Design Alternatives Evaluation (109 KB)

10) Appendix E - Draft Traffic Report (3.6 MB)

11) Appendix F - Drainage and SWM Report (27 MB)

12) Appendix G - Noise Report (9.5 MB)

13) Appendix H - Air Quality Assessment (26 MB)

14) Appendix I - Preliminary Geotechnical Investigation DRAFT (4.5 MB)

15) Appendix J - ESR Construction Cost Estimates (14 KB)

 

Connecting CommunitiesMetrolinx & Ontario Logos

convenient . sustainable . reliable